Project Overview
Original brief was to replace the entire Data Centre. Existing Data Centre cooling systems had reached the end of their serviceable life and a decision was made to replace the systems and re-route the cable network from below the restricted floor void to the ceiling void overhead as the floor void was so congested that all air distribution was virtually impossible.
Retaining the existing computer floor and ceiling made considerable savings to the end user which helped towards other budgets within the business. The challenge was to install all new services and plant whilst maintaining existing infrastructure and build.
Project Budget
£81,670.00
Project Details
New Data Centre, Burton
Project Description
Supply, installation and commissioning of 4No Airedale DF22X2-EZR down flow full function units, connected to 4No Airedale CR50H-0 air cooled condensing units, along with under floor water leak detection system, fault indication panel and full maintenance/call out service package.