NextiraOne, Data Centre, Eastleigh

“Temperature Control Ltd were appointed as specialist air conditioning, close control partners to provide a design and build solution to our Data Room in Eastleigh. It was completed professionally, on time, within budget and the quality from the beginning to end was excellent.”

BRIAN BIRCHALL
PROJECT MANAGER, NEXTIRAONE (UK) LIMITED

Project Overview

The New Data Centre was formed within an existing renovated office accommodation. Space was restricted internally, therefore, traditional Close Control equipment could not be used and the APC Inrow Cooling Solution was used because of its reduced footprint and increased rack cooling capacity.

Project Budget

£78,202.00

Project Details

NextiraOne, New Data Centre, Eastleigh

 

 Project Description

Installation of 2 No. Aquasnap Liquid Chillers
100kW to serve the APC Inrow Cooling Solution.

Client Information

NextiraOne carry out the installation of Data Centres throughout the UK to which Temperature Control Ltd have contributed by carrying out the design and build cooling solutions.